KHALIFA AVE. | DUKHAN ROAD DESIGN AND BUILD.

Client/Owner Ashghal
Designer DAR Alhandasa
PMT KBR
Consultant PARSONS International Consultants
Location Doha, State of Qatar
Contract Type Build/ Partial Design (initially)
Design – Build (new)
Re-measured
Project original construction duration 1,090 days
Project expected revised duration 2,099 days
 

Project Brief Description

Upgrading two Major Highways “Dukhan Road” (6.5 Km) & “Gharrafa Street” (3.0 Km)

  1. Five Interchanges
    • 2 x (3 Level Grade)
    • 3 x (2 Level Grade)
  2. Underpasses (4,273 m Long)
  3. APM tunnel at Qatar Academy (413 m Long)
  4. Drainage Micro-tunnel (1.6 & 2.4m diameter) (8,972 m Long)
  5. Road Works (approx. 9,500 m Long)
  6. Diversion Roads (approx. 23,000 m Long)
Copyright © 2016 - QD-SBG.com - All Rights Reserved